Waterways Ontario
  • summer camp 2
Spring Maintenance, TSW Bridges

Spring Maintenance, TSW Bridges

Posted by admin on Apr 12th 2016

Parks Canada is preparing for the 2016 boating season, maintaining bridges along the Trent Severn Waterway. Some temporary closures are involved.

In the coming weeks, Parks Canada will be conducting spring maintenance at some of our swing bridges and sites along the Trent-Severn Waterway, in preparation for the 2016 navigation season. This includes preventative maintenance tasks like washing and greasing swing bridges and conducting visual inspections to ensure their safe operability.

Temporary Bridge Closures

Parks Canada would like to advise residents and visitors of the following temporary bridge closures for regular spring maintenance, weather permitting:

page1image8504 page1image8664 page1image9088 page1image9248 page1image9672 page1image10096 page1image10256

May 3 May 4 May 5

Warsaw Road Swing Bridge (Peterborough) Maria Street Swing Bridge (Peterborough) McFarlane Street Bridge (Peterborough)

9:00 AM 2:30 PM 9:00 AM 2:30 PM 9:00 AM 2:30 PM

Traffic Delays

Seasonal maintenance on certain bridges that cross the Trent-Severn Waterway will not result in closures, but vehicles may experience short delays of about 10 minutes:

April 18 to mid-May Brighton Road Swing Bridge Carrying Place Swing Bridge

Glen Ross Swing Bridge
Ranney Falls Swing Bridge (Campbellford)
Hastings Swing Bridge
Bobcaygeon Swing Bridge
Bolsover Swing Bridge
Boundary Road Swing Bridge
Lakeshore Road Swing Bridge
Couchiching Bridge
Hamlet Swing Bridge (on Canning Road near Washago) Port Severn Swing Bridge

Motorists are asked to plan their routes accordingly in order to avoid delays. To accommodate school bus traffic, efforts will be made to keep bridge delays between 9:00 am and 2:30 pm. Parks Canada wishes to thank the public for their patience during the maintenance period. 

 

©   2017 WaterWays Ontario